Case: Mobile Technologies – efficient engineering in multisite collaboration

Background

With a vision to revolutionise human interactions using mobile solutions, Mobile Technologies Inc (MTI) – which has over 850 employees spread across four locations – has established itself as a pioneer in mobile device display technologies.

Operating in an industry like this requires a huge amount of flexibility as designs can go through multiple iterations during development. However, until recently, MTI’s engineering change order (ECO) process was largely manual. Initiators were literally running around the office to collect all required signatures and there were problems collecting all required signatures in a timely manner. Ultimately, ECOs often created significant delays. Also, in the multisite company, employees faced challenges with version managment. MTI’s ECO process was time and cost intensive. Also, existing systems did not integrate with MTI’s resulting in many documentation issues and a very time-consuming quoting process. Collaboration was weak which was a big issue considering how geographic dispersion of the company.

With all this in mind, MTI decided to implement Bluestar PLM. Implementation took five months from start to finish. It included the install and configuration of Bluestar PLM inside AX, customising features to meet the company’s needs and creating training documentation. The process included on-site training in MTI’s US and Hong Kong offices.

Results

  • Reduce time spent on engineering change order processes
  • One shared platform for Multisite collaboration
  • Seamless data flow between the technical department to production
  • Full integration with existing ERP system, Dynamics AX
  • One system to assure accuracy and efficiency
  • Version management: Immediate access to accurate data from global departments
  • Error reduction

“We’ve reduced time spent on ECO processes by 80%. We’ve achieved multi-site engineering collaboration and created one central place to store and manage our data. And we have true revision and lifecycle control.

We are very happy about the communication and collaboration with the support team for Bluestar. We received great support during the implementation. And we look forward to working with the team at Bluestar PLM long into the future.”

Anna Toloeva, System Integration Lead Mobile Technologies

Our customers gain competitive advantages

We have implemented Bluestar PLM for more than hundreds of enterprises and world-wide 10,000 users. Following implementations, we have evaluated on our customers’ user experiences and benefits achieved from having our system onboard. These evaluations have given us great examples of the results gained from Bluestar PLM inside Dynamics 365/AX.

80% reduction in time spent on engineering change management processes 80
15% increase in production line efficiency 15
50% reduction in BOM-related errors 50
80% reduction in time spent on document control 80

Want to learn more about Bluestar PLM inside Dynamics 365/AX?

Interested in Growing Your Business?

Contact us and learn more about what we can offer you.

Poul Bak Pedersen
Sales Director EMEA
pbp@bluestarplm.com