Bluestar PLM for Marine & Offshore

Bluestar PLM offers a scalable module-based PLM solution for Microsoft Dynamics 365 Finance & Supply Chain Management, delivering different levels of integration with CAD, PLM and ERP, fitting your unique business needs. Start simple by CAD/PDM + ERP Connectors, explore a single business system by having CAD + PLM + ERP with Bluestar PLM, or move your business towards enterprise product configuration by choosing the Product Configuration Module.

Gain a competitive edge by leveraging your time-to-market

Manufacturers for the Marine & Offshore industries face several challenges as their products have to withstand the harsh conditions of the sea, sometimes over a hundred kilometres from the seashore. This not only puts pressure on manufacturers to build their products sturdy enough to survive in such environment, but also to create and manage the documentation of these often customer specific, one-off products in a way that the after-sales services can be handled with accuracy and confidence for decades.

To stay competitive and ensure long-term customer satisfaction, such manufacturers need to have a product management system with capabilities of aligning and keeping history on their engineering data coming from different CAD or documentation systems.

Challenges of non-embedded PLM and ERP systems

  • Manual data synchronization between the ERP, PLM and CAD systems can cause data misalignments.
  • Reusing data is challenging due to time-consuming manual data transfers.
  • Missing visibility in end-to-end business processes leads to non-value-added work time.
  • Order fulfillments are delayed by bottlenecks causing operational performance to suffer.
  • Sharing engineering data between different sites can be troublesome without a common data management system.
  • Engineering change orders are executed without understanding the impact on the supply chain.

How Bluestar PLM benefits Marine & Offshore Industries

Synchronize projects between your PLM and ERP system

With the collaboration between Bluestar PLM’s and Dynamics 365’s project management module, engineering projects can be started in the PLM, then finalized in D365/AX. Integration to Power BI and Bluestar PLM’s advanced workflows allow engineering managers to have full control over the engineering project processes, while the SmartExport-functionality provides an easy solution for exporting and sharing the project data.

Align CAD data in a shared database

Manage CAD data from different 2D and 3D CAD systems in a shared database to be able to create and document full products or projects within a single system.

Standardize product description and enhance reusability with classes and attributes

Create multi-level classification system with attributes to improve searchability and reusability for engineering and management. Using attributes to autogenerate name and description can increase the traceability and standardization of data, minimizing the unnecessary re-creation of already existing products, components and documents.

Allow traceability and transparency of historical data by revision-control PLM

Gain full management over your engineering data with status and revision control and utilize these functions in D365/AX as well. Keeping full history on products or components allows engineers and managers to find and retrieve previous revisions easily.

Have full control over your PLM documentation

Create general and product-specific documentation and certifications through the Microsoft Office-integration and manage them in Bluestar PLM.

The implementation process was painless – especially on the Bluestar PLM side, where all the underlying system information was controlled. We experienced a safe support from PDM Technology and the system is easy to use. We heard good recommendations about Bluestar PLM from others in the industry who were very satisfied. That confirmed our feeling that we were choosing the best solution.

Jesper Bangsgaard, Logistics Manager, Hydratech Industries

Hydratech Industries

The level of quality has improved in all of our products, and the more standardized the product, the faster it can be produced. The implementation of Bluestar PLM was based on PDM Technology’s ability to challenge us with critical questions. That is how we developed the core elements needed in a solution that suit our business.

Peter Johansen, IT Manager, SH Group

SH Group

Our customers gain competitive advantages

We have implemented Bluestar PLM for more than hundreds of enterprises and world-wide 10,000 users. Following implementations, we have evaluated on our customers’ user experiences and benefits achieved from having our system onboard. These evaluations have given us great examples of the results gained from Bluestar PLM inside Dynamics 365/AX.

80% reduction in time spent on engineering change management processes 80
20% reduction in time to market 20
50% reduction in time spent for configurations and CAD drawings 50
80% reduction in time spent on document control 80

Want to learn more about Bluestar inside D365/AX?

10 reasons why you need ERP based PLM

Whitepaper

“10 Reasons Why You Need ERP-based PLM”

Learn why PLM – Product Lifecycle Management, is essential for your manufacturing company to enter Industry 4.0. By having a single solution where the PLM system is embedded in ERP, you can fully leverage product data to satisfy customer demands and deliver orders on time and within budget.

Interested in Growing Your Business?

Contact us and learn more about what we can offer you.

Poul Bak Pedersen
Sales Director EMEA
pbp@bluestarplm.com